Budget Planner

Draw up your renovation the way a contractor prices it: room by room, from itemised Dubai quote rates. See the total, where each dirham goes and how long it takes, before you speak to anyone.

Your home
sq ft
Bedrooms
4
Bathrooms
4
What you are doing
Fine-tune the scope
Finish level
Fees, reserve and location
Guides suggest 10–15% for surprises behind walls and late changes.
Section through a villa, coloured by where the budget goes NOC 3,000 sq ft built-up 1 4 5 6 7 8 9 10 11 2 3 12
Estimated budget, including VATAED 0
Time on site-Working days, from real projects
Cost per sq ft-Before VAT
Plan-

Every AED 100 of your budget

Each square is AED 1 in every 100. Hover a square, a room or a line to see it across the plan.

Schedule of works

    How your plan sits in the Dubai market

    Published per sq ft ranges from our villa renovation cost guide. Your plan uses itemised quote rates instead, so it shows where your scope and finish land.

    From approval to handover

    Bill of quantities

    Quantity x rate, AED before VAT

    Pay by finished stage

    Contracts in the benchmark end with a 5% payment on handover; hold it until snagging is done. Contingency is only paid if used.

    Your split against 23 Dubai villa projects

    Bars show the middle half of 23 itemised villa estimates, works only. The dot is your plan.

    What each finish level buys

    Supply allowances: the amount a quote includes for the item itself. Pick something dearer and you pay the difference. Brands are examples, not endorsements, and no brand pays SoukLocal.

    ItemEssentialMid-rangePremium
    Wall-hung WC with cisternRAK about AED 1,200–2,500Grohe about AED 3,800Kohler or Bagnodesign AED 6,000–8,000
    Shower set (mixer and head)RAK AED 1,350–2,100Grohe about AED 2,400Premium AED 5,250–7,000
    WashbasinRAK AED 450–1,500RAK upper rangePremium AED 3,100–5,000
    Floor tile, per sq mPorcelain AED 100Porcelain 60x120 AED 120Marble AED 250–350
    Kitchen worktop, per sq mGranite or quartz AED 325Quartz AED 350Premium quartz AED 600
    Spotlight, eachAED 70AED 100AED 100 plus decorative lights from AED 250
    Switch or socket, eachSchneider AED 60Schneider AED 60Premium ranges about AED 100
    Internal door leafAED 275AED 350AED 600

    See every line of your plan

    A free account unlocks:

    • Every line with quantity, rate and amount
    • Payment stages and brand allowances for your finish
    • Save it, change it later, and send it to up to 3 vetted contractors
    Unlock my plan: sign in free Google or a one-time email code. Free for homeowners. We only contact you about your project.
    Estimated budgetAED 0See the plan
    The short answer

    A mid-range full interior renovation of a 3,000 sq ft Dubai villa comes to about AED 552,000 with design, approvals, a 10% contingency and VAT. Kitchen and joinery take about 25% and bathrooms about 19%. The planner builds each budget from itemised quote rates, so you can change rooms, scope and finish and watch the split move.

    How the Budget Planner works

    • Rates: 2,791 priced lines in 24 itemised quotes for Dubai villa and apartment renovations, 2024 to 2026, by a mid-to-premium design-and-build contractor. Essential uses the lower quartile of what was quoted, Mid-range the median, and Premium the upper quartile or premium-brand allowances. Budget contractors may quote less; check the market panel.
    • Quantities: worked out from your home. Finished floor area is 80% of the built-up area; gypsum ceilings cover 65% of it. One spotlight per 2.5 sq m of ceiling, and one switch or socket per 2.5 sq m of floor. AC sized at 1 ton per 400 sq ft, in 5-ton ducted units. Each bathroom: 22 sq m of wall tiles and 5 sq m of floor; the main bathroom gets a bathtub at Premium. Doors: one per bedroom and bathroom, plus two. Windows: two per bedroom, plus four. Each wall removed: 10 sq m of new blockwork and 25 sq m of screed to make good. Garden: half paving, 40% grass; planters along a quarter of the edge. Painting is quoted per home; the planner prices it per sq ft of a 3,000 sq ft home, times yours.
    • Fees: design, approval drawings and site set-up are priced as fees by project size, as contractors quote them. Developer NOC fees and deposits are shown separately; see do you need a permit?
    • One room: switch to One room to price a kitchen, bathroom, bedroom or living room by its size, from the same rates. Fees are left out there, because contractors often fold them into a single-room price.
    • Range: the low and high figures move half a finish level down and up, the spread between levels in the same quotes.
    • Time: working days on site from 10 recent Dubai renovations in the same benchmark. Community NOC times are from published developer guides.
    • Split check: your split against the middle half of 23 itemised villa estimates. As verified contractors share quotes through SoukLocal, we will widen the benchmark and publish the sample size.

    A planning guide, not a quote. Get itemised quotes in AED, with VAT shown, before you commit. For single rooms see kitchen and bathroom costs.

    Questions

    How much does it cost to renovate a villa in Dubai?

    For a 3,000 sq ft villa with four bedrooms and four bathrooms, a mid-range full interior renovation (kitchen, bathrooms, floors, ceilings, wardrobes, doors, electrical and AC) comes to about AED 552,000 including design, approvals, a 10% contingency and VAT. Adding new windows, a garden, a pergola and a 30 sq m pool takes it to about AED 819,000. A refresh of floors, ceilings, lighting and paint is about AED 203,000.

    Where does the money go in a villa renovation?

    In a mid-range full interior plan, kitchen and joinery take about 25% of the budget, bathrooms about 19%, MEP, AC and lighting about 12%, and flooring about 12%. Design, approvals and site set-up are fees of roughly AED 10,000 to 14,000 each on a project under AED 1 million.

    Where do the planner's rates come from?

    From 2,791 priced lines in 24 itemised quotes for Dubai villa and apartment renovations, 2024 to 2026, by a mid-to-premium design-and-build contractor. Essential uses the lower quartile of what was quoted, Mid-range the median, and Premium the upper quartile or premium-brand allowances. Budget contractors may quote less.

    How long does a villa renovation take in Dubai?

    Across 10 recent Dubai renovations in the same benchmark, full interior jobs ran 55 to 75 working days on site and whole-villa jobs with outdoor or structural work ran 110 to 156 working days. Add the community NOC before work starts, and an authority permit for structural or external work.

    Is VAT included?

    Yes. The planner adds VAT at 5% to the contractor's works, fees and contingency. Developer NOC fees and refundable deposits are shown separately because you pay them to the developer, not the contractor.

    Why do I need an account to see the full plan?

    The full plan is personal: every line with quantity and rate, brand allowances for your finish level, payment stages, and the option to save it and send it to up to 3 vetted contractors. A free account keeps it for you. We only contact you about your project.