Apartment renovation in Dubai: rules and approvals (2026)

The short answer

Most Dubai apartment renovations start with an NOC from the building's management or owners' association. Painting and new floors need no Dubai Municipality permit. Moving partition walls, plumbing or wiring needs a permit from the authority for the area: Dubai Municipality, Trakhees or the DDA. Changes to the structure or outside look of the unit also need master developer and Dubai Land Department approval under Law No. 6 of 2019.

First approvalBuilding NOC
Painting, new floorsNo DM permit
1-bed full renovation, publishedAED 100,000 – 200,000

Here for the numbers? Every published price band, per sq ft and by apartment size, with its source and date, is in apartment renovation costs in Dubai. This guide covers what you can change, who approves it and how the job runs.

What can you change in a Dubai apartment?

Inside finishes, usually; the structure, the outside and the common parts, only with approvals. Law No. 6 of 2019 lets an occupant make substantial alterations to the structure or external appearance of a unit only after the master developer, the Dubai Land Department and the competent authority approve them. Common parts may be used only for their intended purpose.

ChangeWhat it needsBasis
Repainting, light cosmetic workNo Dubai Municipality permit; confirm with your buildingDubai Municipality (2023); Property Finder
New floor finishesNo Dubai Municipality maintenance permit; towers may set acoustic and waterproofing conditionsDubai Municipality (2023); Property Finder
Kitchen or bathroom that changes plumbing, wiring, ventilation or layoutBuilding NOC and an authority permitProperty Finder
Electrical upgrades, air-conditioning ducting or load changesBuilding NOC and an authority permitProperty Finder
Adding or removing partition wallsBuilding NOC and an authority permitProperty Finder
Minor structural repairsDubai Municipality self-maintenance permit, issued onlineDubai Municipality (2023)
Structure or external appearance of the unitMaster developer, Dubai Land Department and authority approvalLaw No. 6 of 2019, Article 39
Common parts (corridors, shared areas)Use only for their purpose; never converted to private property without Dubai Land Department and authority approvalLaw No. 6 of 2019, Articles 17 and 39

If you change something without approval, the same law makes you liable to put right any damage at your own expense. Your building's management regulation binds you as an owner and binds your tenant too.

Who approves an apartment renovation?

The building first, then the permit authority for the area if the scope goes beyond cosmetic work.

Apartment renovation approvals in Dubai, in order 1. Building NOC. 2. Drawings, where the scope needs a permit. 3. Permit from the authority for the area. 4. Works under the building's rules. 5. Completion inspection, where the authority requires it 1 Building NOC From the management company, owners'association or developer that runs thebuilding Owner asks; building issues 2 Drawings, where the scope needs apermit Walls, plumbing, wiring, air-conditioning Licensed engineering consultant 3 Permit from the authority for the area Dubai Municipality, Trakhees or the DDA Consultant or contractor submits 4 Works under the building's rules Hours, lift booking, floor protection, deposit Contractor 5 Completion inspection, where theauthority requires it Trakhees: Modification Completion Certificatebefore you use the space Contractor or consultant
  1. Building NOC: From the management company, owners' association or developer that runs the building (Owner asks; building issues)
  2. Drawings, where the scope needs a permit: Walls, plumbing, wiring, air-conditioning (Licensed engineering consultant)
  3. Permit from the authority for the area: Dubai Municipality, Trakhees or the DDA (Consultant or contractor submits)
  4. Works under the building's rules: Hours, lift booking, floor protection, deposit (Contractor)
  5. Completion inspection, where the authority requires it: Trakhees: Modification Completion Certificate before you use the space (Contractor or consultant)
The general order for an apartment. Cosmetic work usually stops after the building NOC. Sources: Law No. 6 of 2019, Property Finder, Trakhees and DDA procedures listed below.
AuthorityPermit, as it names itWho appliesPublished timePublished fee
Dubai Municipality (most of the mainland)Building permit through the Dubai Building Permit System; self-maintenance permit for minor structural repairsLandowner, contractor or consultant (self-maintenance permit)Not in the sources we openedNot in the sources we opened
Trakhees (PCFC areas)Modification Permit, for completed buildingsApplicant or consultant, online7 working days from payment approval (target)As per project specification
Dubai Development Authority (DDA zones)Building Modification Permit, for completed buildingsContractor2 working days (estimated)AED 1.0 per sq ft of additional or relevant built-up area, plus AED 20

Property Finder (September 2025) estimates authority permit costs of about AED 1,500 to 2,500 for an interior-only apartment scope and AED 2,500 to 4,000 with MEP changes, before consultant fees. Not sure which authority covers your building? Use which authority approves my job. If your building is in a Nakheel or other PCFC area, read Trakhees approval in Dubai.

What does an apartment renovation include?

It depends on the tier. Binghatti (August 2026) describes five, from a light refresh to a luxury renovation:

TierWhat it may includeApprovals, usually
Light refreshPainting, minor repairs, selected lighting or fixture replacements, limited flooringBuilding NOC
Targeted upgradeA kitchen or bathroom upgrade, flooring, painting, selected joinery, limited electrical or plumbing workBuilding NOC; a permit if plumbing or wiring changes
Full mid-rangeKitchen, bathrooms, flooring, ceilings, lighting, painting, MEP coordination, handover cleaningBuilding NOC and an authority permit
PremiumHigher-grade materials, custom joinery, stone or quartz surfaces, upgraded bathrooms, detailed lightingBuilding NOC and an authority permit
Luxury or penthouseBespoke joinery, imported finishes, extensive MEP work, smart-home systemsBuilding NOC and an authority permit; consultant drawings

Tier descriptions from Binghatti. The approvals column applies the permit list in the table above; your building and authority decide in each case.

How much does an apartment renovation cost?

A full mid-range renovation runs about AED 60,000 to 120,000 for a studio and AED 100,000 to 200,000 for a 1-bedroom, by Binghatti's August 2026 ranges.

ApartmentCosmetic or partial (AED)Full, mid-range (AED)Premium (AED)
Studio25,000 – 60,00060,000 – 120,000120,000 – 200,000+
1 bedroom50,000 – 100,000100,000 – 200,000200,000 – 350,000+

Larger apartments, costs per sq ft and what pushes a budget up are in apartment renovation costs in Dubai. For modelled ranges by finish, see the Dubai renovation price index; to price your own plan, use the Budget Planner.

How long does an apartment renovation take?

About 6 to 10 weeks on site for a full studio or 1-bedroom renovation and 8 to 16 weeks for a 2 or 3-bedroom, by Binghatti's estimates. Approvals come first:

  • Building or developer NOC: about 7 to 14 days, varying by community (Property Finder).
  • Authority permit: Trakhees targets 7 working days from payment approval for a new Modification Permit; the DDA estimates 2 working days for a Building Modification Permit. Property Finder puts authority review at 10 to 15 working days for simple projects.
  • Completion: in Trakhees areas, the Modification Completion Certificate has a 3 working day target after the inspection request.

Durations by scope and what makes jobs run late: how long a renovation takes in Dubai.

When can contractors work, and is there a deposit?

Your building sets the hours, and most towers take a refundable deposit. Property Finder says most towers limit noisy work to weekdays and set hours, and that deposits are commonly AED 2,000 to 5,000, refunded if the common areas stay undamaged.

  • City-wide hours: Gulf News (updated 23 October 2025) reports that Dubai Municipality allows construction from 6am to 8pm on weekdays and 7am to 8pm at weekends. Outside those hours, residents can report noise in the Dubai Municipality app, on 800900 or at [email protected].
  • Gated communities and private towers: the same report says to contact the developer or community management, as the municipal app does not cover them.
  • Before deliveries: book the service lift, protect floors and walls, and tell the building and your neighbours. Our checks for apartment works list what to agree with the building.

How should you pay for an apartment renovation?

In stages tied to work you can see, with everything in writing. Binghatti advises recording payment stages, variations, completion, retention, snagging and warranties in the contract, and confirming which fees and building deposits the price includes.

  • Ask who applies for the building NOC and any permit, and who pays the fees and deposit.
  • Tie each payment to a stage, not a date, and agree variations in writing before the work.
  • Keep a retention until snagging is done.

Published stage ladders, deposits and retention: renovation payment terms in Dubai. To line up two or three offers, use the quote comparison tool.

How do you check an apartment renovation contractor?

Check the licence and the Contractor Register before you sign. Under Dubai Law No. 7 of 2025, in force since 8 January 2026, no company may operate as a contractor unless it is licensed and on the register, and owners may not engage an unregistered contractor. It applies on the mainland and in special development and free zones. Existing contractors have until 8 January 2027 to comply.

  1. Look up the trade licence and its activities, then the register status: check a contractor, step by step.
  2. Read how to check a contractor's licence and what the Contractor Register means.
  3. In Trakhees areas, consultants and contractors in charge of design or site work must have their engineers accredited by Trakhees.
  4. Ask for proof of insurance: what to ask for.

Questions

Do I need permission to renovate my apartment in Dubai?

Almost always from the building: most managed buildings want an NOC from the management company or owners' association first. Painting and new floors need no Dubai Municipality permit. Moving partition walls, plumbing or wiring also needs a permit from the authority for the area.

Can I remove a wall in my Dubai apartment?

Only with approval. Adding or removing partition walls is listed among works that need a permit, and changes to the structure or outside look of a unit need the master developer, the Dubai Land Department and the permit authority to approve under Law No. 6 of 2019.

Who issues the permit for an apartment renovation?

The authority for the area: Dubai Municipality on most of the mainland, Trakhees in PCFC areas such as Nakheel communities, and the Dubai Development Authority in its zones. Trakhees calls it a Modification Permit and targets 7 working days; the DDA Building Modification Permit takes about 2 working days.

How much does it cost to renovate an apartment in Dubai?

Published 2026 ranges put a full mid-range renovation at about AED 60,000 to 120,000 for a studio and AED 100,000 to 200,000 for a 1-bedroom. Cosmetic work costs less and premium work more; the cost guide has every band and source.

What hours can contractors work in a Dubai apartment?

Your building sets them. Most towers limit noisy work to weekdays and set hours, so check the owners' association conditions. Gulf News reports Dubai Municipality allows construction from 6am to 8pm on weekdays and 7am to 8pm at weekends.

Keep going

Sources

This guide is general information, not legal advice. Rules change and vary by community and authority: confirm with the authority or your consultant before you start work.

Free for homeowners

Ready to get offers?

You get an email receipt at once, and within 1 working day (replies 08:00–20:00, Mon–Sat) we tell you whether verified businesses are available for your area. Businesses see the job and the area, never your contact details, until you and the business both confirm the same offer.

Step 1 of 3The job
Step 2 of 3Budget and timing
Budget
When do you want to start?
Step 3 of 3How we update you

We confirm your request within 1 working day. Businesses contact you once verified in your area.

Get matched offers

Get offers from renovation contractorsFree · verified businesses · your details stay private